Let’s talk ↗

OUR WORK / RAIL SURVEYS

Don’t take our word for it.
Take a look.

Rail sites, captured and processed in 2026. Below is what each survey found, counted from its own data.

1,401
tree crowns within 5 m of the rail
1,297
trees tall enough to reach the track
116
drainage records to verify at the track
156
ponding candidates

OUR SURVEYS / WHAT EACH SURVEY FOUND

Site by site.
In numbers.

Every figure is a screening result with an ID, a position and its measurements behind it in the register.

RAIL SURVEY

Rural corridor, 239 m

Single track running into a cutting. 141 million survey points.

Tree crowns within 5 m of the rail
267Each with its height, crown area and distance to the rail.
Trees tall enough to reach the track
59Height greater than distance to the track. Tallest 13.3 m.
Vegetation inside the 3D envelope
21 masses667 m² of footprint, 934 m³ of volume.
Drainage records to verify
176 on the track surface, 11 within 2 m of the rail.
Ponding candidates
204 within 2 m of the rail.
RAIL SURVEY

Rural corridor, 772 m

Two sections of track, crossed by a road bridge. 514 million survey points.

Tree crowns within 5 m of the rail
509Each with its height, crown area and distance to the rail.
Trees tall enough to reach the track
807Height greater than distance to the track. Tallest 25.0 m.
Vegetation inside the 3D envelope
18 masses4,005 m² of footprint, 12,558 m³ of volume.
Drainage records to verify
201 on the track surface, 19 within 2 m of the rail.
Ponding candidates
972 within 2 m of the rail.
RAIL SURVEY

Rail cutting, 365 m

Curved track in a deep cutting, crossed by a bridge. 184 million survey points.

Tree crowns within 5 m of the rail
268Each with its height, crown area and distance to the rail.
Trees tall enough to reach the track
149Height greater than distance to the track. Tallest 16.5 m.
Vegetation inside the 3D envelope
21 masses1,427 m² of footprint, 3,225 m³ of volume.
Drainage records to verify
4216 on the track surface, 26 within 2 m of the rail.
Ponding candidates
225 within 2 m of the rail.
RAIL SURVEY

Suburban corridor, 568 m

Two sections of track beside parkland.

Tree crowns within 5 m of the rail
357Each with its height, crown area and distance to the rail.
Trees tall enough to reach the track
282Height greater than distance to the track. Tallest 24.3 m.
Vegetation inside the 3D envelope
43 masses2,141 m² of footprint, 5,713 m³ of volume.
Drainage records to verify
376 on the track surface, 31 within 2 m of the rail.
Ponding candidates
1712 within 2 m of the rail.

Counts are screening outputs from each survey. They are candidates for field checks, not confirmed defects. Tree findings are for review by a qualified arborist. Ponding is modelled from the terrain, not observed water.

A railway track seen from driver’s eye height, drawn entirely from survey points, with trees on both sidesFly one survey Scroll along a corridor we surveyed, chapter by chapter ↗

ABOUT GRID SCAN / LET’S TALK ABOUT YOUR SITE

Let’s see what
your site’s hiding.

Grid Scan turns aerial survey data into practical evidence for the people planning, maintaining and managing a site.

Tell us the location, the assets and the decision ahead. We’ll help scope the capture and deliverables.

Prefer email? info@gridscan.au

Your details will be used to respond to this enquiry.